The industrial park’s centralized wastewater treatment plant is designed and built with a total capacity of 8,000 m3/day, utilizing advanced and modern technology to ensure the collection and treatment of wastewater generated by operating units within the industrial park, meeting prescribed standards before being discharged into the environment.
During the process of attracting investment projects, industrial parks prioritize projects with minimal risk of environmental pollution. For projects with large wastewater volumes, industrial parks guide units to implement preliminary treatment solutions before discharging wastewater into the industrial park, and simultaneously negotiate with investors to sign wastewater treatment contracts to ensure compliance with environmental protection laws.
During the process of attracting investment projects, industrial parks prioritize projects with minimal risk of environmental pollution. For projects with large wastewater volumes, industrial parks guide units to implement preliminary treatment solutions before discharging wastewater into the industrial park, and simultaneously negotiate with investors to sign wastewater treatment contracts to ensure compliance with environmental protection laws.







